Manufacturing Capability
Production Equipment:
300T/400T/630T/1000T/1600T/2500T/6300 ton screw press, hydraulic die forging hammer, CNC center, auto-lathes, punching, milling, grinding, drilling, polishing machine, heat treatment furnace, shot blasting machine.
Quality Control:
Spectrometer, tensile testing machine, hardness test, impact testing machine, three coordinate detector (CMM), metallographic analysis, magnetic particle flaw detector, ultrasonic flaw detector.
Frequently Asked Questions
How long does it take to receive samples?
Pattern: 30-45 days after order. Sample: 30 days after pattern finishing. The lead time is the general production period and does not include transportation time.
What is the new product development process?
We begin with tooling and sample orders (50% deposit), hold departmental alignment meetings, design molds/fixtures in-house, followed by material purchase, machining, inspection, and sending the sample with an initial report.
How do you handle quality problems?
We perform APQP at early stages, implement strict product requirements, and conduct patrol and final inspections before packing. A final audit is also performed prior to dispatch.
What are the standard payment terms?
Terms are negotiable. Typically, we request 50% of the tooling fee in advance. For production, we prefer a 50% deposit and the balance by T/T before shipping.
How long does shipping take from China?
By sea: About 6-7 weeks to Europe and 2-3 weeks to US ports. By air: About 7 days to all major international destinations.
How do you maintain client confidentiality?
We are happy to sign and strictly honor Confidentiality Agreements (NDA) with all our customers to protect their designs and data.